Community Solar 

Group A – Projects located in the service territories of Ameren Illinois, MidAmerican, Mt. Carmel Public Utility, and rural electric cooperatives and municipal utilities located in MISO

Blocks 1-4 Filled. Currently Accepting Projects to Waitlist. Click here to view the waitlist. 



Current ordinal number from lottery that is number one on the waitlist: 36 (Elba Solar 1)
Ordinal numbers were assigned in the lottery results.

 

Group B – Projects located in the service territories of ComEd, and rural electric cooperatives and municipal utilities located in PJM

Blocks 1-4 Filled.  Currently Accepting Projects to Waitlist. Click here to view the waitlist.


Current ordinal number from lottery that is number one on the waitlist: 84 (Boone 2(a))
Ordinal numbers were assigned in the lottery results.

Notes:

  • Waitlist files are updated daily.
  • When an application is placed onto the waitlist, it’s assigned an ordinal number that remains with it until it’s selected from the waitlist. If an application ahead of it drops out, the ordinal number assigned to that withdrawn application will no longer appear on the waitlist. As a result, there may be gaps in the ordinal numbers shown on the downloaded waitlist.
  • Applications that were submitted and subsequently withdrawn from the Program for any reason are no longer reflected in any category in the dashboards above.